Hundred million buildings, there are nine rainbows everywhere! During the construction process, if the material hoist encounters a sudden event, what should we do? Today we will
Let's talk about this issue.
First, the alarm and notice: When a hoist safety incident occurs, the project management personnel at the scene should immediately report the danger to the project emergency team. Emergency
The team immediately summoned all personnel carrying their own rescue tools and rushed to the scene of the accident.
Second, command and control.
Third, the rescue team arrived at the accident site, under the command of the emergency team to work separately.
(1) The first rescue team and the project manager together to identify the danger: to determine whether there is a source of danger. If the broken high and low voltage wires are energized; hoist
Whether the components or other components continue to collapse or not; the casualties of the personnel; after the rescue plan is agreed, the project manager shall report to the company for approval.
, and then organize the implementation.
(2) The protection team is responsible for evacuating workers in the vicinity of the accident site to a safe area and conducting alert to prevent idlers from approaching and paying attention to polite language
.
(3) The on-site duty electrician is responsible for cutting off the power supply of dangerous low-voltage electrical lines. If at night, turn on the lighting;
(4) The rescue team immediately rescues the wounded when evading the risk of further collapse or electric shock: contact the ambulance and perform hemostasis in time.
The stretcher carried the injured person to the car and was taken to the hospital.
(5) The dismantling and repairing of the deformed hoist after the accident should be done under the guidance of the manufacturer.
(6) After the accident emergency rescue is completed, the project manager immediately convenes the emergency team members and all the comrades of the hoist driver team to conduct an accident investigation.
Identify the cause of the accident, the responsible person, and formulate similar rectification measures to prevent recurrence.
(7) Review and revise the effectiveness of the emergency plan.
Fourth, the communication project department must be 110, 120, the mobile phone number of the emergency leadership team member of the project department, and the member of the emergency leadership organization of the company.
The telephone number of the local safety supervision department should be clearly indicated on the construction site. Site rescue commanders and security personnel should be familiar with these numbers.
V. SECURITY AND SECURITY SECURITY The security team established an alert area around the scene of the accident to implement traffic control and maintain order on the scene.
6. Evacuation and resettlement of crowds The work of evacuation personnel should be conducted in an orderly way to comply with the guidance requirements of the commanders to conduct evacuation, so as not to panic, do not mix
Mess, crowded, reduce casualties.
This article from Beijing Jiu Hong Hui Xin Trading look forward to your visit guidance!
Let's talk about this issue.
First, the alarm and notice: When a hoist safety incident occurs, the project management personnel at the scene should immediately report the danger to the project emergency team. Emergency
The team immediately summoned all personnel carrying their own rescue tools and rushed to the scene of the accident.
Second, command and control.
Third, the rescue team arrived at the accident site, under the command of the emergency team to work separately.
(1) The first rescue team and the project manager together to identify the danger: to determine whether there is a source of danger. If the broken high and low voltage wires are energized; hoist
Whether the components or other components continue to collapse or not; the casualties of the personnel; after the rescue plan is agreed, the project manager shall report to the company for approval.
, and then organize the implementation.
(2) The protection team is responsible for evacuating workers in the vicinity of the accident site to a safe area and conducting alert to prevent idlers from approaching and paying attention to polite language
.
(3) The on-site duty electrician is responsible for cutting off the power supply of dangerous low-voltage electrical lines. If at night, turn on the lighting;
(4) The rescue team immediately rescues the wounded when evading the risk of further collapse or electric shock: contact the ambulance and perform hemostasis in time.
The stretcher carried the injured person to the car and was taken to the hospital.
(5) The dismantling and repairing of the deformed hoist after the accident should be done under the guidance of the manufacturer.
(6) After the accident emergency rescue is completed, the project manager immediately convenes the emergency team members and all the comrades of the hoist driver team to conduct an accident investigation.
Identify the cause of the accident, the responsible person, and formulate similar rectification measures to prevent recurrence.
(7) Review and revise the effectiveness of the emergency plan.
Fourth, the communication project department must be 110, 120, the mobile phone number of the emergency leadership team member of the project department, and the member of the emergency leadership organization of the company.
The telephone number of the local safety supervision department should be clearly indicated on the construction site. Site rescue commanders and security personnel should be familiar with these numbers.
V. SECURITY AND SECURITY SECURITY The security team established an alert area around the scene of the accident to implement traffic control and maintain order on the scene.
6. Evacuation and resettlement of crowds The work of evacuation personnel should be conducted in an orderly way to comply with the guidance requirements of the commanders to conduct evacuation, so as not to panic, do not mix
Mess, crowded, reduce casualties.
This article from Beijing Jiu Hong Hui Xin Trading look forward to your visit guidance!
Utility Knife,Plastic Utility Knife,Mini Utility Knife,Aluminum Mini Utility Knife
Shangqiu Jinda Tools Co.,Ltd , https://www.jindameasur.com