Color steel sandwich panel installation knowledge

The installation of color steel sandwich panel curtain wall panel generally adopts movable scaffolding, and the common sense of installation of color steel sandwich panel when ensuring the bearing capacity of construction scaffolding



The installation of color steel sandwich panel curtain wall panels generally adopts movable scaffolding. When ensuring the bearing capacity of construction scaffolding, it is also necessary to consider:

(1) the distance between the curtain wall surface, the working surface and the axis;

(2) Find the spacing and position of the control points against the reference surface, pay attention to the visibility;

(3) Find the spacing of the mounting angles against the reference surface;

(4) the level difference between the control and the elevation;

(5) The vertical distance from the building and the distance from each floor.

Color steel sandwich panel curtain wall panel installation accuracy:

The verticality of the façade is 2mm, the surface flatness is 3mm, and the joint straightness is 0.5mm. The installation should be strictly carried out according to the technical manual provided by the factory.

End of installation:
After the color steel sandwich panel curtain wall is installed, the protective adhesive tape on the surface of the wall panel is torn off from top to bottom, and the rack is synchronously disassembled layer by layer. When disassembling, pay attention to protect the wall panel, do not hurt or scratch, and finally complete the construction of the entire curtain wall project. Adhesives that affect the surface decoration of curtain walls and curtain wall components during construction should be removed immediately. After the curtain wall project is installed, a cleaning plan from top to bottom should be developed to prevent surface decoration from being abnormal. The neutral detergent used to clean the wallboard should be inspected to prove that it does not corrode the coating on the surface of the wallboard. Neutral detergent should be cleaned with water after cleaning.
Http://news.chinawj.com.cn Submission:

Steel Elbow

Steel Elbow,Pipe Fitting Elbow,Stainless Steel Elbow,Carbon Steel Elbow

Cangzhou Youlong Pipe Fitting Manufacturing Co., LTD , https://www.youlongpipe.com