Work program
1. Implementation of the process
1.1 During the injection molding production process, the operator will do a self-test and check the appearance of the product. The inspector will do the first part of the boot product and fill in the “First Inspection Recordâ€. Sampling work, and fill in the "Inspection Record", the inspection requires the operator to rework the unqualified products, record and mark the reworked products, and review the reworked products until the product quality requirements are met.
1.2 The relevant provisions of the “Process and Product Measurement and Monitoring Management Procedures†for the release of products shall be implemented, and the “Management Procedures for Nonconforming Products†shall be implemented for the non-conforming products that appear.
1.3 Inspection and inspection of inspection products by inspection personnel shall be carried out according to the requirements of the “Inspection Specifications for Injection Molded Partsâ€.
1.4 Environmental control during the process
1.4.1 Injection molded finished products, semi-finished products, qualified and non-conforming products shall be placed neatly according to the specified area and marked according to the provisions of the “Logo and Traceability Management Proceduresâ€. The inspector has the right to control the process and coordination.
2. Process supervision
2.1 The measurement and monitoring of the process is an important means and method for monitoring and controlling the quality. The purpose of the operator's self-inspection and inspection by the inspector is to supervise and control the quality and process effects in the production process. Implemented in accordance with the Process and Product Measurement and Monitoring Management Procedures and fill in the appropriate inspection records.
2.2 After the completion of each injection molding section, the inspection will be signed on the “Production Process Card†before it can be transferred to the next process.
2.3 According to the “Management Procedures for Training, Awareness and Competenceâ€, the Quality Department conducts on-the-job training for the relevant personnel in the inspection process. The personnel of the special process should undergo special training, and after the passing of the examination, they should be employed and the quality control personnel should be properly arranged.
3. Process improvement
3.1 The problems discovered by the quality control personnel should be corrected in time, analyzed, and improved methods should be identified and implemented in accordance with the Corrective and Preventive Action Control Procedures.
3.2 The improvement of the injection molding process involves the modification of the process documentation or quality management documents in accordance with the requirements of the “Management Procedures for Documents and Materialsâ€.
4. Reconfirmation of the process
In the injection molding department, when the injection molding production conditions change (such as changes in materials, facilities, personnel, etc.), the quality control department inspectors should reconfirm the above process, re-confirm, and take measures to ensure changes in the ability to influence the process. Respond in time.
Emergency Lighting System,Emergency Lights For Home Power Failure,Rechargeable Emergency Light,Led Emergency Lights
Foshan Nai An Lighting Electric Co.,ltd , https://www.naipsled.com