In the renovation process is not it should go to the decoration scene to see it? As the saying goes, the insiders are looking at the door and the amateurs are watching. However, what exactly do we look at in the decoration scene and how do we look at it to achieve a multiplier effect?
â– View 1: Waterproofing Projects For hidden waterproofing projects, the most important thing is to do meticulous construction. First of all, before the renovation, the construction personnel must do a 24-hour water-retaining test. After confirming that there is no leakage, clean up the ground debris, remove the loose parts, and then use a cement mortar to smooth the uneven areas, and then the entire Flattened on the large surface. Closed water test can also play a role in distinguishing and determining the responsibility of the waterproofing project. There is a leakage phenomenon responsible for the developer; there is no leakage after the renovation and there is leakage, the responsibility is in the decoration company.
If the bathroom is waterproof, the water will splatter to the adjacent wall when bathing. If there is no protection of the waterproof layer, the partition wall and the top corner wall will be easily damp and moldy. Therefore, be sure to waterproof the wall before laying the wall tiles. Normally, the wall surface should be waterproofed by 30 cm. However, if the light wall is not load-bearing, the whole wall should be waterproofed, at least. It is 1.8 meters high. Special attention should be paid to the corners and strictly prevent the occurrence of drip leaks. In fact, most of the waterproof layer leaks are corners. Therefore, if these places are properly prepared, the possibility of leakage will be reduced.
â– View 2: wall and keel if the wall and keel violated the operating procedures can not easily be found. For example, due to the collapse of the ceiling as a whole or in part, the ceiling becomes a "top drop."
The combination of the ceiling and the floor and the keel and the veneer is not good, or the load is too large, which may easily cause a "top drop."
According to the regulations, the ceiling keel shall not be twisted or deformed. The installed keel shall be firm and reliable. The horizontal deviation shall not exceed 5 mm; a chandelier or ceiling fan exceeding 3 kg in weight shall not be hung on the ceiling keel, but shall be separately provided. If the ceiling is made of gypsum board, the thickness should be about 9mm.
â– View 3: It is the key to keep a watchful eye on the fragmented project. [Incorrect operation: Mixing of hot and cold water pipes]
White is a cold water pipe, red is a hot water pipe, and a cold water pipe and a hot water pipe are mixed together.
There are hidden dangers: the expansion and contraction rate of hot and cold water pipes is different. Due to thermal expansion and contraction, the cold water pipes burst and leak.
Standard operation: distinguish hot and cold water pipes according to color and operate strictly.
[Error Operation II: Wires Without Insulation Tubes]
During the construction, the wires are directly buried in the wall. The wires are not covered with insulating tubes, and the wire connectors are directly exposed.
There are hidden dangers: This is very unsafe, and may cause short-circuit of the wires due to some reasons, such as the aging of the wires, resulting in wire breakage; at the same time, once the wire is broken, it cannot be changed at all, only the wall knocks on the ground.
Standard operation: The wires must be laid with insulation sleeves on the outside, and the circuit joints should not be exposed on the outside. They should be installed in the line box. No joints are allowed between the distribution boxes.
[error operation three: free to split the waterway]
In the case that the owner did not understand the decoration, he misled the owner to dismantle the waterway at random and wasted money.
There are hidden dangers: waste of money is only one aspect. Once it is not sealed or lacks pressure during the demolition of the waterway, it will lead to burst of water pipes.
Normative operation: When the pipeline is changed, it will move and it must not be moved when it is not.
[error operation four: repeat wiring]
A large number of repeated wiring, multi-use materials, waste the owner's financial and material resources.
There are hidden dangers: Once a problem arises in the line, it is difficult to detect it in a layout like "Tian Luo Di Network."
Normative operations: Arranged closely, in the case of no more than 40% of the capacity of the pipe, the same trending line can be worn in a pipe. However, it is necessary to separate strong and weak electricity.
[error operation five: wire separation]
All the wires used a color, and they wanted to work.
There are hidden dangers: once the line is in trouble, the line of discordance is detected again.
Normative operation: The bottom box wire wraps are wrapped with different signs. Red line and red bag cloth are used for the FireWire, and blue, green and black are used for the zero line, and the same kind of color is used to wrap the cord cloth. The grounding line applies yellow, green, blue and black wires.
â– View 1: Waterproofing Projects For hidden waterproofing projects, the most important thing is to do meticulous construction. First of all, before the renovation, the construction personnel must do a 24-hour water-retaining test. After confirming that there is no leakage, clean up the ground debris, remove the loose parts, and then use a cement mortar to smooth the uneven areas, and then the entire Flattened on the large surface. Closed water test can also play a role in distinguishing and determining the responsibility of the waterproofing project. There is a leakage phenomenon responsible for the developer; there is no leakage after the renovation and there is leakage, the responsibility is in the decoration company.
If the bathroom is waterproof, the water will splatter to the adjacent wall when bathing. If there is no protection of the waterproof layer, the partition wall and the top corner wall will be easily damp and moldy. Therefore, be sure to waterproof the wall before laying the wall tiles. Normally, the wall surface should be waterproofed by 30 cm. However, if the light wall is not load-bearing, the whole wall should be waterproofed, at least. It is 1.8 meters high. Special attention should be paid to the corners and strictly prevent the occurrence of drip leaks. In fact, most of the waterproof layer leaks are corners. Therefore, if these places are properly prepared, the possibility of leakage will be reduced.
â– View 2: wall and keel if the wall and keel violated the operating procedures can not easily be found. For example, due to the collapse of the ceiling as a whole or in part, the ceiling becomes a "top drop."
The combination of the ceiling and the floor and the keel and the veneer is not good, or the load is too large, which may easily cause a "top drop."
According to the regulations, the ceiling keel shall not be twisted or deformed. The installed keel shall be firm and reliable. The horizontal deviation shall not exceed 5 mm; a chandelier or ceiling fan exceeding 3 kg in weight shall not be hung on the ceiling keel, but shall be separately provided. If the ceiling is made of gypsum board, the thickness should be about 9mm.
â– View 3: It is the key to keep a watchful eye on the fragmented project. [Incorrect operation: Mixing of hot and cold water pipes]
White is a cold water pipe, red is a hot water pipe, and a cold water pipe and a hot water pipe are mixed together.
There are hidden dangers: the expansion and contraction rate of hot and cold water pipes is different. Due to thermal expansion and contraction, the cold water pipes burst and leak.
Standard operation: distinguish hot and cold water pipes according to color and operate strictly.
[Error Operation II: Wires Without Insulation Tubes]
During the construction, the wires are directly buried in the wall. The wires are not covered with insulating tubes, and the wire connectors are directly exposed.
There are hidden dangers: This is very unsafe, and may cause short-circuit of the wires due to some reasons, such as the aging of the wires, resulting in wire breakage; at the same time, once the wire is broken, it cannot be changed at all, only the wall knocks on the ground.
Standard operation: The wires must be laid with insulation sleeves on the outside, and the circuit joints should not be exposed on the outside. They should be installed in the line box. No joints are allowed between the distribution boxes.
[error operation three: free to split the waterway]
In the case that the owner did not understand the decoration, he misled the owner to dismantle the waterway at random and wasted money.
There are hidden dangers: waste of money is only one aspect. Once it is not sealed or lacks pressure during the demolition of the waterway, it will lead to burst of water pipes.
Normative operation: When the pipeline is changed, it will move and it must not be moved when it is not.
[error operation four: repeat wiring]
A large number of repeated wiring, multi-use materials, waste the owner's financial and material resources.
There are hidden dangers: Once a problem arises in the line, it is difficult to detect it in a layout like "Tian Luo Di Network."
Normative operations: Arranged closely, in the case of no more than 40% of the capacity of the pipe, the same trending line can be worn in a pipe. However, it is necessary to separate strong and weak electricity.
[error operation five: wire separation]
All the wires used a color, and they wanted to work.
There are hidden dangers: once the line is in trouble, the line of discordance is detected again.
Normative operation: The bottom box wire wraps are wrapped with different signs. Red line and red bag cloth are used for the FireWire, and blue, green and black are used for the zero line, and the same kind of color is used to wrap the cord cloth. The grounding line applies yellow, green, blue and black wires.
Entrance decoration restaurant decoration cement decoration decoration company look good ceiling fan light bathroom tile bathroom door bathroom tile color bathroom ceiling material bathroom ceiling overall bathroom bathroom waterproof bathroom leak
Fuonce-Lighting , https://www.fuoncelighting.com