In the chemical machinery factory, it often encounters the pressure or hydrostatic test after the heat exchange tube group is welded. Due to the (?) end (?) flange connection, it brings difficulties to the test. It used to be welded at both ends. Specification of the pipe, and welding (?) pipe end flange, so after the test is completed, it is necessary to cut the two parts, and smooth the incision, labor and time-consuming materials, for this, I designed the joint as shown Make the test easy and convenient.
Shoring Prop
Chuzhou Jincheng Metalwork Co.,Ltd , https://www.jinchengscaffold.com