Water and electricity acceptance is a very important part of the entire hard-packing phase, which directly affects the comfort of the occupants of the house and the service life of the decoration. Many TXs have reacted to this issue without understanding and fearing being tricked by profiteers. Today we follow professional supervision together to learn the doorway in this area. In the early morning, I drove to a family home located in Kangtai Dongyuan, where we will illustrate the whole process of detailed inspection and acceptance by netizens.
Although the room type is not great, but as long as there is a bold and innovative designer, find a wealth of inspiration and creativity to achieve your own "dream" castle, make the home to meet the function you want, beautiful and environmentally friendly design, to create their own Personality site.
Kangtai Dongyuan Hydropower acceptance stage
Room type: 2 bedrooms, 1 hall, 1 bathroom
Practical area: 74.8 square meters
Alipay supervision: Ma Guozhen
Decoration company: Runtai
Outside the rain kept coming, although the weather was not good, but the feeling of children is still very good, oh, this time the site has any characteristics yo, with curiosity came to the destination, suddenly appeared in front of a vine The tree is covered with grapes.
The owner’s house is on the 3rd floor and the view is still OK.
Next, we can take everyone to take a look at the actual site
Two rooms water and electricity acceptance entrance decoration decoration design electrical space TV decoration house decoration decoration decoration company okay kitchen cabinet door bathroom design bathroom door
Sealand is a trustworthy manufacturer of Gas Mass Flow Meter, Gas Mass Flowmeter, Gas Flow Meter, Gas Flowmeter, Gas Meter, ATEX, IECEx & CE approved.
The installation is as follows.
1. Installation Steps
a) Choose correct installation site, taking installation area, pipeline, transmitter location &
valve location into consideration;
b) Install the meter according to direction mark on sensor;
c) Install the sensor & transmitter on pipeline;
d) Connect transmitter & sensor with 9-pin cable;
e) Start.
a) Sensor stays away from mechanical vibration source, for example, pump. Use flexible pipe to connect meter with pipeline if inevitable. The housing of meter must be standalone, out of touch with any other device. There must be 3 times the size of sensor between 2 sensors if there are many flow meters on the same pipeline, to avoid resonance.
b) Do not install sensor on pipeline that easily expands with hot and contracts with cold, especially near expansion joint, which leads to a worse stability.
c) Sensor stays away from industrial electromagnetic field, such as large generator and transformer, better 5m at least. Such device influences the performance of drive coil and pickoffs. Make sure magnetic field intensity less than 400A/m.
d) Sensor shall be installed on lower pipeline, to be easily full of fluid.
e) Make sure Ex-mark meet application requirements if in hazardous area.
f) Build a sunshade if the meter is under direct solar radiation. g) Keep the meter from corrosive liquid.
Gas Mass Flow Meter, Gas Mass Flowmeter, Gas Flow Meter, Gas Flowmeter, Gas Meter
Zhejiang Sealand Technology Co., Ltd. , https://www.sealandflowmeters.com