Fireproof plasterboard partition construction

Fire-resistant plasterboard must choose products that meet the fire protection specifications in the home. The length is the entire space height, width 900 or 1200mm. Thickness According to the design requirements, the installation of partitions shall be carried out after the completion of the roof, floor, interior plastering, glass and other processes.
This project is a single-layer gypsum board partition wall, and the gypsum board is arranged vertically. When the gypsum board on both sides of the keel is arranged, it should be staggered. The seam of the gypsum board board joint surface is a blind seam, and the gypsum board is a wedge-shaped board edge. The adhesive between gypsum board and gypsum keel is SG construction adhesive. When the door leaf opens to the gypsum board partition wall, the retaining wall fixing device shall be installed. Such as the door to meet or door stopper, in order to prevent the door handle impact damage to the partition wall. The wall structure see the factory atlas. The partition wall is connected to the roof by means of an auxiliary gypsum keel.

Determine the spacing of the keel according to the width of the gypsum board, then press the vertical keel to install the auxiliary keel on the upper part, the wooden wedge and the slant on the lower part, and finally paste the gypsum plaster board. The glued board must be after the keel bonding is final (not too early) In 4h). First apply a 3 to 5mm thick adhesive to the plate in the width of 30mm around the plate and the keel. Push the board tightly and press it tightly. Beat it with a rubber hammer to make the board and the keel tightly. After the panel is plastered, check the wall surface immediately and horizontally. Find the problem in time and correct it. After the paste, clean the debris in the board seam. The putty is embedded in the plate and is to be sewed. After the final setting, the putty is about 1mm thick at the seam, and then the seam tape is immediately affixed, and the squeegee is squeezed and smoothed with a knife. When the putty begins to coagulate, it is cut with a large knife. Put on the putty, filling the wedge edge of the gypsum board.

Space Effect Drawing Villa Design Space Glass Glass Door

LED Submersible Light

304 stainless steel & high-gloss tempered glass lens: 304 stainless steel and high-gloss tempered glass lens have good pressure resistance and corrosion resistance, and can adapt well to underwater working environment. Jiangmen Synno Co., Ltd is a high and new-tech enterprise. Our company specialized in LED green light source. And we are engaged in medium and high-end LED decorative lighting with a whole set of design and manufacture of lamps and lanterns, development of control system and engineering supporting service. Our company is devoted to provide customers with LED application products. Synno has got through ISO9001 quality system certification of SGS of Switzerland, CE certification of European Union, GS certification, ROHS certification and relevant domestic LED lamps and lanterns certification.

Led Submersible Light,Submersible Underwater Led Light,Submersible Pool Lights,Submersible Led Fountain Light, Submersible Led Light

Jiangmen Synno Lighting Co., Ltd. , https://www.synnoled.com