1, waterproof construction should use waterproof coating
2. The waterproof project should be done after the concealed project construction is completed and accepted
3, After the completion of waterproof construction to do two water storage test
4, the bathroom waterproof layer should not be less than 1.8 meters
5, floor drain, Yin Yang angle, pipelines and other places to do more waterproof
6, floor drain to use deodorant floor drain
7, hot and cold water left hot right cold
8, try not to walk from the ground
9, cold water pipe in the wall should have a protective layer of 1CM, hot water pipe is 1.5CM, so the slot to open deep
10, PPR pipe is installed to consider the thickness of the tiles, so that the pipe will not be exposed
11, only a few minutes to cook, wash vegetables for a long time, bucket must buy big
12, leading and counter basin to support, can not be installed on the up
13, toilet installation can not use cement, use silicone
14, toilets, taps should be carefully protected after installation
15, to consider the toilet pit when buying a toilet
16, the washing machine to consider whether it is drainage or drainage
17, best not to install the bathroom phone, easy to damp
18, The mirror in the bathroom should first consider the size, otherwise the mirror headlight is very easy to install.
19, bathroom pipe is best to leave the access hole
Tile toilet bathroom cement mirror headlight toilet waterproof bathroom tile bathroom size tile adhesive
Flanged Carbon Steel Ball Valve
Flanged Carbon Steel Ball Valve,Mild Steel Ball Valve,Carbon Steel Flanged Ball Valve,Carbon Steel Socket Weld Ball Valve
Zhejiang Chenxiang import and export trade Co., Ltd , https://www.chenxiang-valve.com