In September, when the decoration season began, many consumers thought that after signing the renovation contract with the home improvement company, the rest could be handed over to the decoration workers. In fact, in order to prevent certain irresponsible decoration teams from cutting corners and shoddy work during the construction process, consumers should focus on the acceptance process within their capabilities. Each stage of the project is completed, and the subsequent steps are carried out after acceptance, so as to ensure the final decoration quality.
House home flagship store    Ketu Sofa
1 Material: signing a detailed material list when signing a contract
When signing a contract with a customer, the formal decoration company will sign a material declaration sheet detailing the brands, specifications and quality grades of the required materials. The parties shall check the materials according to the material specification. In general, the materials to be checked before construction include pipes, wires, planks, putty, cement, sand, etc. As the project advances, ceramic tile, paint, and paint will be accepted later.
[Acceptance notice]
Time of acceptance of agreed materials
After the material is purchased, the purchaser must notify the other party to the contract to prepare for the acceptance of the material, preferably when the material enters the site. The agreed acceptance time is very necessary to avoid material entry, the other party does not have time to accept the material, affecting the construction progress.
Acceptance must be present
The home improvement contract stipulates that after acceptance of the materials, the inspector must sign on the site to avoid unnecessary troubles or disputes later. The inspector shall carry out the necessary inspections for each material agreement stipulated in the contract, such as brands, specifications and quantities.
Acceptance person should sign on acceptance form
If the inspection result material is qualified, the acceptance person should sign the material acceptance form. If the owner finds that the entry materials are inconsistent with the contractual requirements, he may refuse to sign the material acceptance checklist until he negotiates with the home improvement company for settlement.
2 Covert Projects: Acceptance before Closed
In the early stage of the project, pre-acceptance should be carried out for completed concealed projects such as hydropower projects. Because these projects will be obscured when they are completed, they must be checked before they are closed to prevent concealment from becoming a hidden problem.
[Acceptance notice]
Circuit: Note whether the wire is up to standard
Since the switch panel has not yet been installed at this time, when the circuit is accepted, the consumer pays attention to whether the used wire is the designated brand and whether the wire is up to the standard.
The wires used should meet the maximum output power of the electrical equipment. In general, the average household lighting requires a wire with a cross-sectional area of ​​2.5 mm2, and the air conditioners and other household appliances use a wire with a cross-sectional area of ​​4 mm2.
Dark lines buried in the wall must be installed outside the casing, the casing material is better than PVC material or galvanized iron pipe.
Waterway: Conduct pressure test
If the water pipe is not sealed properly, the water pipe bursts. Therefore, after the completion of the waterway reconstruction, the water pressure test must be performed. In addition, it depends on whether the installation of the faucet, accessories, etc. is square, solid, complete, without damage, whether the water is smooth, whether the floor drain is smooth, etc., should be carefully checked. The easiest way to check if a floor drain is open is to pour a bucket of water on the floor and see if the water flows smoothly.
Waterproof: 24 hours closed water test
Closed water test is a common method for testing waterproofing in home improvement. In the closed water test, the consumer needs to determine the test time with the foreman first, then close the drain hole of the room and put the water into the room (the water level is not lower than 3cm ) After 24 hours, check or ask if there is leakage in the downstairs household.
Check the bathroom wall waterproof when you can first check the wall paint is uniform, there is no leakage brush phenomenon, in particular, to check if the yin and yang angle leak brush, to avoid yin and yang due to leaking brush waterproof coating caused by dampness and mildew. The waterproof height of the shower wall is usually about 1.8m, and the wall waterproof of other areas should be higher than 1.5m.
3 Completion: Verification of increase and decrease items
After the completion of the acceptance, the decoration company will settle the final amount of the project.
In order to avoid the miscalculation of the added item, the owner must also measure and verify the addition and subtraction items that appear during the renovation process, take out the decoration contract and drawings, and check the same as well. Whether the construction project has been completed or not, and whether the design is the same as originally planned, has not achieved the desired results.
After acceptance, the owner must sign a good warranty agreement with the decoration company to safeguard their own rights and interests.
[Acceptance notice]
Bricklayer: bricks are empty
Attention should be paid to whether the ground is inclined or not; whether the gaps in the brick surface are regular and consistent; whether there is sufficient drainage slope in floors with floor drains such as toilets and balconies; and whether the brick surface has broken and collapsed angles. Test whether there is free drum wall drum can hit the wall with a small hammer, such as the sound of empty wall drums that there is a phenomenon, according to family home decoration project quality acceptance standards, 100 wall hollow drum wall brick should not exceed 5 pieces.
Paint: smooth surface
You can touch the wall with your hand to feel that the paint is smooth, soft, smooth and clean without particles. The wall should have no emptying, blistering, cracking, and no stains.
Carpentry: Structure formation
Mainly depends on whether the structure is straight, whether the angle is accurate, whether the parquet is tight, whether the arc and roundness are smooth, whether the cabinet door switch is normal, whether the ceiling corner line connection has obvious unevenness and deformation, and whether the skirting line is installed. Straightness, accurate ground clearance, whether the ceilings of toilets and kitchens, such as aluminum gussets and PVC gussets, are flat and deformed, and whether the door handle locks are installed correctly and open.
Miscellaneous: normal drainage
In accordance with the provisions of the contractual project, one by one shall review whether the project has been completed, check whether the lamps and lanterns are all properly illuminated, whether the project waste has been completely removed, whether the sanitary fixtures and other installations are installed correctly, and the toilets include water storage and flushing, and wash basin drainage. Is it normal?
Construction Acceptance Entrance Decoration Children's Room Decoration Home Decoration Paint Decoration Company Room Kitchen Wall Tile Door Kitchen Cabinet Door Bathroom Tile Bathroom Door Bathroom Wall Tile Bathroom Wash Basin Toilet Design Toilet Waterproof Home Decoration Home Kitchen Tile Balcony Tile Decoration Home Tile Specification
PCR Plates, 96 Well PCR Plates, and 348 well plates are disposable consumables in the laboratory. They are widely used in genetics, biochemistry, immunology, medicine and other fields. They are not only used in basic research such as gene isolation, cloning and nucleic acid sequence analysis, but also Diagnosis of disease or any place where there is DNA or RNA.
The new line of white PCR products is designed specifically to optimize results when performing quantitative Real Time PCR (qPCR). The new 96 Well PCR plates are free of DNA, DNase, RNase, and other PCR inhibitors. 96 Well PCR plates have thin, uniform walls to ensure consistent, precise thermal transfer and excellent results.
96-Well PCR Plate,96 Well PCR Plate,96 Well PCR Plate Volume,96 Well Skirted PCR Plates,96 Well Plate Sealing Film
Yong Yue Medical Technology(Kunshan) Co.,Ltd , https://www.yongyuemedicals.com