For the first time the owners of the house to buy, decoration is a very anxious thing. Because many people are ignorant of the decoration, in the end it is first to lay the floor or the first brush it? Is the first to ask the carpenter or painter first ask? A series of problems flooded, often people can not start. Here we take a look at the steps of Shanghai's home improvement , hoping to give everyone some help!
Shanghai house decoration steps
1, the pre-plan
When you are ready to decorate your house, you must not be lazy. It is best to personally measure the area of ​​the renovated house, such as tiling area, wallpaper area, wall paint area, etc. After clarifying this, we must begin to make a wall standard for placing furniture. In the steps of house renovation, this is a step that everyone can not ignore.
2, the main demolition reform
When you enter the construction process, the main demolition reform is the front-most project, which mainly includes the demolition wall, base wall, shovel wall, change steel window and so on. Dismantled garbage should be promptly cleaned to ensure indoor cleanliness. At the same time, remember to finalize the product door, cabinet, hood, stove, water heater, and so on.
3, hydropower reform
Hydropower renovation is the third step in Shanghai's home improvement . However, prior to this, cabinet designers should come to the door to make measurements, determine the power supply, waterway reconstruction program, and so on. But for the kitchen needs to do not need to be waterproof, or which bathroom the water heater should be installed in, etc. These owners will be prepared.
Carpenter
In the construction process, the first carpenter, then the bricklayer, and finally the oil worker. This is the correct construction step, but the principle of entering the field is who is the dirty one. Regardless of the carpenter's activities, such as installing a pipe, fitting a ceiling, or plastering a plaster line, it is determined according to the situation in the home that the main body is to be demolished.
5, tiling
Before the tiling, you must first purchase a good floor drain and do a good job of waterproofing. The steps on the tiling and the carpenter can be carried out at the same time. There is no conflict between the two. According to the actual situation, the construction steps of the two are decided. Many families save time at the same time. construction.
6, brush wall paint
After the above steps are completed, you can begin to work on the wall base, brush finish, and furniture painting. If you are preparing for a wallpaper, you only need to let the “oil worker's third child†do the grassroots treatment on the wall surface of the wallpaper.
7, kitchen and toilet ceiling
The ceiling of the kitchen and bathroom is the beginning of the installation process. With the ceiling installed, the moisture-proof ceiling lamp and exhaust fan (Yuba) of the kitchen and bathroom can be installed. Pay attention to the need to flow out the thread and open the hole when installing the ceiling. However, the ceilings on the market are all integrated designs. The lights, the Yuba, and the exhaust are all integrated with the ceiling.
8, other
Finally, kitchen cabinet equipment, wooden door equipment, floor equipment, installed radiators, furniture, and appliances were left in the steps of house decoration in Shanghai . These steps are very important to the owners, so we must strictly follow these procedures to avoid unnecessary trouble!
Conclusion of the article: In the question of what to do in the first step of renovating a house, after everyone has browsed the steps of Shanghai's house decoration , is it right? When decorating the house, the owners must not take it lightly for the choice of furniture quality. Can not blindly pursue cheap goods, so as not to be worth the candle!
Manual Chain Hoist,Chain Block,Manual Chain Block,Hand Hoist
Guangdong Gongyou Lift Slings Machinery CO.,LTD , https://www.gongyouslings.com