Three points design seven points construction ———
The owner, Lu Yong, will record the decoration process of his home and share with you the hardships, lessons learned and experience gained.
After the signing of the renovation contract, the next step is to enter the construction phase. Many people say that this is the beginning of the "tough battle." "Three-point design seven points decoration", this is even a designer will not deny an argument. There is no rigorous implementation of a good decoration team, careful construction, and clever, perfect design is no good.
â— Look at the construction site to understand the construction process
When looking for a decoration company at the beginning, every company will follow me with a great deal to show how advanced their technology is and how rigorous the process is, but what I believe is what we believe to be.
Nowadays, the decoration company will basically have a shuttle bus to the construction sites on weekends, allowing customers to go to the site to “checkâ€. However, it can be imagined that the decoration company is willing to bring the site to be visited by everyone. It must be the best foreman and the best construction team below. The quality of the project is naturally top-notch. Therefore, the most effective way is for the designer to help recommend a few foremen, or to find out which team has a good reputation among other customers who have been renovated in this company. Afterwards, we must focus on understanding these issues for us. More reliable construction team engineering quality.
Since I'm almost a complete layman of engineering, it is actually a hearsay about how to judge the level of a construction team. For example, bricklayers should pay special attention to tiles. Tiles may seem like a simple task. However, if you want to do a good job, it is absolutely a terrific skill. For another example, if the wall surface is handled well, you can't just look at the naked eye. It's best to Take a table lamp or emergency light on the wall, and then from the side to see if the paint is not evenly coated, there is no obvious flaws; there are ceilings, in particular, should pay attention to the joints in the corner, and so on.
â— The best step in the end
After a visit to the foreman and the team, I finally selected a team that was more satisfying to me. The captain surnamed Li, who is very clever and very talkative, and he and my designer Iowa had previously cooperated, should be said to understand each other, have the basis for working together. So, I had a good time with Iowa. I came to the bottom of my house on Wednesday and officially started the work on Saturday.
The work is very important, although it is nominally the designer to hand over the design proposal to the construction team on the ground. However, in fact, because the designer's renderings are somewhat "on paper", they arrived at the scene and were handed to the construction team. More or less, there will be some changes.
My family will inevitably have such design changes. The most important thing is still the bathroom part that I want to change. Since there are two walls that are not on a horizontal line, you need to build a dice about 10 cm on one side of the wall or simply change the kitchen to open. In addition to this, the demolition space also involves two sets of heating shifts, and this work is my company can not complete the decoration, but also need me to contact HVAC company to solve this problem. And so on, and how the home theater I ordered recently reserved lines and how to wire the surround speakers in advance; the water pipes used in my home area are PER-T pipes, and we are looking for the right company to transform this special material pipe; The cabinet designer comes to the door to measure the design, explain the location of the reserved power supply, and so on. In short, at the end of the handover, it is best to deal with the renovation of the area together, to account for the construction team to the construction team, to avoid half of the post-project, suddenly remembered which part is missing, but also Rework.
â— Watching the foreman guide to make unnecessary additions
At the end of the handover, Iowa and the project manager were withdrawn, and Mr. Li told me about other things. For example, the walls of the entire bathroom must be fully covered with water, and the water resistance of the cloakroom and the kitchen should also be 1.2 meters above the wall. It is said that this is more standardized and reduces hidden dangers in the future. It also says that some owners require the entire house to be made. Waterproof. I stayed with my eyes and did not immediately agree with Mr. Li’s suggestion.
On the way home, I went to find Aohua and told her about it. She told me that there is no need to waterproof the cloakroom, and the significance of the kitchen is not great. The key is that the bathroom must be done well, the shower area must be brushed to the top, and other parts, in addition to the ground to be waterproof, other places Just curl up 40 centimeters. As far as the other spaces in the house, such as the living room and the bedroom, do not make much sense for waterproofing. This I realized that in order to make more money and make more money, construction workers will always advise the owners to add more items. In this case, the best way is to find a designer, or directly to the project manager, and they appear to coordinate. Iowa told me "The designer's job can be more than just design. I will be responsible to you if the decoration is not completed."
Villa Design Entrance Decoration Decoration Design House Decoration House Space Home Improvement Decoration Ceiling Effect Drawing Decoration Decoration Company Decoration Home Living Room House Decoration Effect Picture Home Kitchen Cabinet Door Kitchen Cabinet Door Bathroom Design Toilet Waterproof Toilet Ceiling Bathroom Tile Toilet Door Cloakroom Effect Picture Bedroom Lamp Kitchen Small tile bedroom
Elevator Traction Machine Kits & Packages
Permanent magnet synchronous elevator gearless traction machine
VVVF asynchronous elevator geared traction machine gearbox worm gear
AC380V/50Hz Elevator Traction Machine, AC220V/60Hz Elevator Traction Machine,
Roping 1:1 2:1 4:1
Elevator Traction Machine Kits & Packages
Items Included Recommendations: Traction Machine, Encoder, protective cover, handwheel, machine bed, diverting pulley, damping pad as one package
OTIS Elevator TRACTION MACHINE KITS & PACKAGES, Thyssen Elevator TRACTION MACHINE KITS & PACKAGES, KONE Elevator TRACTION MACHINE KITS & PACKAGES, GiantKONE Elevator TRACTION MACHINE KITS & PACKAGES, ThyssenKrupp Elevator TRACTION MACHINE KITS & PACKAGES, Schindler Elevator TRACTION MACHINE KITS & PACKAGES, XJ Schindler Elevator TRACTION MACHINE KITS & PACKAGES, Xizi OTIS Elevator TRACTION MACHINE KITS & PACKAGES, Mitsubishi Elevator TRACTION MACHINE KITS & PACKAGES, Shanghai Mitsubishi Elevator TRACTION MACHINE KITS & PACKAGES, Fujitec Elevator TRACTION MACHINE KITS & PACKAGES, Hitachi Elevator TRACTION MACHINE KITS & PACKAGES, Toshiba Elevator TRACTION MACHINE KITS & PACKAGES, Hyundai Elevator TRACTION MACHINE KITS & PACKAGES, LG Elevator TRACTION MACHINE KITS & PACKAGES, Sigma Elevator TRACTION MACHINE KITS & PACKAGES, Express Elevator TRACTION MACHINE KITS & PACKAGES, GUANGRI Elevator TRACTION MACHINE KITS & PACKAGES, FUJI Elevator TRACTION MACHINE KITS & PACKAGES, BLT Elevator TRACTION MACHINE KITS & PACKAGES, CANNY Elevator TRACTION MACHINE KITS & PACKAGES, SJEC Elevator TRACTION MACHINE KITS & PACKAGES, KOYO Elevator TRACTION MACHINE KITS & PACKAGES, IFE Elevator TRACTION MACHINE KITS & PACKAGES
Elevator Traction Machine, Elevator Geared Machine, Elevator Gearless Machine, Geared Traction Machine, Gearless Traction Machine
CEP Elevator Products ( China ) Co., Ltd. , https://www.zjfullelevatorreplacement.com