Correct installation sequence reduces vibration
The correct kitchen and ceiling installation sequence can reduce unnecessary vibrations. The correct installation sequence in the bathroom is to install the Yuba, exhaust fan, and then ceiling. Do not install the exhaust fan or Yuba directly on the aluminum plate, and use the expansion bolt to hang directly on the top concrete. If the exhaust fan of the exhaust fan is relatively long, it is better for the worker to It is fixed at the top. Otherwise, the exhaust pipe will vibrate when the exhaust fan is turned on. The fixing method is very simple, just use a transparent tape to fix it.
The correct sequence for the installation of the kitchen ceiling should be that the hose of the range hood is fixed with the flue first, the other end is selected for the location where the range hood needs to be installed, and the lamp used in the kitchen is bought, but it does not need to be installed first. Then install the ceiling and install the lights. It is best not to install the large fixtures directly on the ceiling.
According to the construction drawing, the color of the plate is arranged in order.
When installing the keel, the keel should be determined according to the design direction of the ceiling construction drawing. After the keel is determined, the keel distance line and the punching point are marked on the roof, and the electric hammer is punched. The drilling depth should not exceed 4 cm. Prevent the damage of the wires and tubes buried in the wall. After the punching is ready, the inner part of the package is inflated into the hole. According to the height of the corners, the galvanized copper wire is sawed and placed into the inner expansion. The keel is cut according to the length of the room, and the keel is fixed on the copper wire with a nut. When laying the ceiling, the shape and color of the plate should be prepared according to the measurement construction drawing. When the plate is arranged, the gusset should be strictly seamless with the corners, and the control line holes should be marked.
When the transportation is stacked, the board should be placed on a flat surface.
The aluminum gusset plate, plastic steel plate or integrated ceiling purchased during the kitchen and bathroom ceiling and the matching keel and fittings shall meet the product quality requirements, and it is necessary to check whether there is bending deformation. During transportation and stacking, the panels should be placed flat, uncompressed, and protected from high temperatures and harmful substances. The keel should be leveled when installed, and the deviation of the pitch should be controlled within the allowable range. When installing, if the size is deviated, it should be adjusted first and then inserted in order, and must not be hard inserted to prevent deformation.
The ceiling of the pipeline shall be provided with manholes
The dark ceiling must be equipped with inspection holes. Many people do not set up inspection holes in the kitchen decoration in the home decoration. It is considered that the impact is beautiful. It is not known that once the pipeline equipment in the ceiling is out of order, it is impossible to check what is the location and what is the reason. Repair, so it is better to set up the manhole for the ceiling of the laying pipeline. You can choose the part that is more concealed and easy to inspect, and make artistic treatment of the manhole, for example, combined with lamps or decorations.
Concerned about surprises
Label: How to properly install the kitchen ceiling?
Previous: What are the advantages of cork laminate flooring, how to use it Next: Internal combustion forklift use environment and characteristics
Wallpaper Tools,Wallpaper Roller,Wallpaper Roll Big Size,Wallpaper Glue Pressing Roller
Jiangmen Nichiyo Decorative Material Co.,Ltd. , https://www.nichiyopt.com