High-voltage wireless nuclear phaser works

1. The on-site operation must comply with the work requirements of the "Pre-test Procedure for Electrical Safety Tools".
2. The instrument must be self-checked before use. The transmitter and receiver batteries must be sufficient, otherwise the sensitivity of the transmitter and receiver will be affected.
3, the use of the process can not be greater than the effective reception distance, the transmitter as far as possible in an open place.
4. Avoid use of radio transmitters during use to avoid interference with the receiver.
5. During the test, the tester wears insulated shoes and is located outside the safe distance.
High-voltage high-voltage wireless nuclear phase analyzer indoor verification method
a. The ejector X and the transmitter Y are connected to the output rod (built-in transmitting antenna), and the two ends of the test line provided by the instrument high-voltage wireless nuclear phase analyzer are respectively connected to the transmitter X and the transmitter hook. After inserting one 220V power supply (because 220V phase fire wire, change to double fire wire, voltage is low), turn on the receiver power switch. After the waveform appears, the instrument is considered normal.
2, on-site use
a. Must comply with the "electric safety tools preventive testing procedures" work requirements.
b. Connect the transmitter X and transmitter Y to the insulation rod respectively (the length of the insulation rod is used according to the voltage)
c. Turn on the receiver power switch. The receiver automatically tracks the X, Y phase waveforms. Displays the phase difference between X and Y phases. (≤ ± 20 degrees is in phase, >20 degrees is out of phase) and shows either in-phase or out-of-phase. Outside the safe distance.

Lighting

Solar Lights,String Lights,Garden Lights,Solar Garden Lights

Foshan Nanhai Pinming Electrical Appliance Co.,Ltd , https://www.mavcadonf.com