Hydroelectricity →Cabinet initial measurement → Then tile → Cabinet retesting →Requires electrical specifications → Ceiling → Door and window frame → Closet → Floor keel → Wall surface treatment → Paint → Floor → Door installation → Sanitaryware → Cabinet installation
Follow-up work can be successive, the principle of construction is to be wet and dry, that is, first to do the cement and then do the wood class, so as not to absorb moisture and wood deformation. The back of the information is to send information according to the construction process.